Close Menu
The Baylor Lariat
    Facebook X (Twitter) Instagram YouTube LinkedIn
    Trending
    • Hispanic concert in Foster Pavilion rescheduled due to World Cup Final
    • Board of Regents approves nearly $1 billion operating budget, new AI-centered master’s degree
    • Foster Pavilion to host rising country star Braxton Keith
    • Dog days: Q&A with Wacoan that built hot dog social media brand
    • Country legend Willie Nelson returns after 72 years for night of harmonies, hits
    • Students react to ‘very stressful’ Canvas outage ahead of finals
    • Canvas access to be restored, Friday finals moved to online Thursday
    • Baylor delays finals as nationwide Canvas outage impedes studying
    • About us
      • Spring 2026 Staff Page
      • Copyright Information
    • Contact
      • Contact Information
      • Letters to the Editor
      • Subscribe to The Morning Buzz
      • Department of Student Media
    • Employment
    • PDF Archives
    • RSS Feeds
    Facebook X (Twitter) Instagram YouTube LinkedIn
    The Baylor LariatThe Baylor Lariat
    Subscribe to the Morning Buzz
    Monday, July 6
    • News
      • State and National News
        • State
        • National
      • Politics
        • 2025 Inauguration Page
        • Election Page
      • Homecoming 2025
      • Baylor News
      • Waco Updates
      • Campus and Waco Crime
    • Arts & Life
      • Wedding Edition 2025
      • What to Do in Waco
      • Campus Culture
      • Indy and Belle
      • Leisure and Travel
        • Leisure
        • Travel
          • Baylor in Ireland
      • Student Spotlight
      • Local Scene
        • Small Businesses
        • Social Media
      • Arts and Entertainment
        • Art
        • Fashion
        • Food
        • Literature
        • Music
        • Film and Television
    • Opinion
      • Editorials
      • Points of View
      • Lariat Letters
    • Sports
      • Football
      • Basketball
        • March Madness 2026
        • Men’s Basketball
        • Women’s Basketball
      • Soccer
      • Baseball
      • Softball
      • Volleyball
      • Equestrian
      • Cross Country and Track & Field
      • Acrobatics & Tumbling
      • Tennis
      • Golf
      • Pro Sports
      • Sports Takes
      • Club Sports
    • Lariat TV News
    • Multimedia
      • Video Features
      • Podcasts
        • Don’t Feed the Bears
        • Bear Newscessities
      • Slideshows
    • Sing 2026
    • Lariat 125
    • Advertising
    The Baylor Lariat
    Home»News»National

    Calif. aims to restart reactor

    Baylor LariatBy Baylor LariatOctober 5, 2012 National No Comments5 Mins Read
    In this Sept. 13 photo the San Onofre nuclear power plant sits along Pacific Ocean coastline in San Onofre, Calif. Associated Press
    Share
    Facebook Twitter LinkedIn Pinterest Email
    In this Sept. 13 photo the San Onofre nuclear power plant sits along Pacific Ocean coastline in San Onofre, Calif.
    Associated Press

    By Michael R. Blood

    Associated Press

    LOS ANGELES — The operator of California’s ailing San Onofre nuclear power plant proposed Thursday to restart one of its shuttered reactors after concluding it could be run safely despite damage to scores of tubes that carry radioactive water.

    A plan to return even one reactor to service is a milestone for Southern California Edison, which has spent months unraveling what caused excessive tube vibration and friction inside the plant’s nearly new steam generators, then determining how it might be fixed.

    But the plant is far from returning to robust operation.

    Edison’s plan, which must be approved by federal regulators, calls for operating Unit 2 at reduced power for five months, then shutting it down for inspections. The outlook for the more heavily damaged Unit 3 is bleaker — no decision is expected on its future until at least next summer.

    Meanwhile, the company is facing a state review of costs related to the long-running outage that could leave customers or shareholders with a huge bill for repairs and replacement power — a figure that had reached $165 million at midyear. The company did not update those figures Thursday.

    Edison, a subsidiary of Edison International, filed its proposal with the Nuclear Regulatory Commission, which is expected to take months to review the details.

    The NRC has said there is no timetable to restart the plant.

    “The agency will not permit a restart unless and until we can conclude the reactor can be operated safely,” NRC Chairman Allison Macfarlane said. “Our inspections and review will be painstaking, thorough and will not be rushed.”

    The proposal was immediately denounced by environmentalists and anti-nuclear activists who have argued for months that restarting the plant between San Diego and Los Angeles would set the stage for a catastrophe.

    About 7.4 million Californians live within 50 miles of San Onofre, which can power 1.4 million homes.

    “Both these reactors are alike and neither is safe to operate,” said S. David Freeman, a former head of the Los Angeles Department of Water and Power who advises Friends of the Earth. “While Edison may be under financial pressure to get one up and running, operating this badly damaged reactor at reduced power without fixing or replacing these leaky generators is like driving a car with worn-out brakes.”

    Edison wants to operate Unit 2 at 70 percent power, which company officials predicted would prevent vibration that has caused excessive wear to tubing.

    Company officials expressed confidence in the proposal, which followed more than 170,000 tube inspections over more than eight months.

    “This is not an experiment,” Pete Dietrich, senior vice president and chief nuclear officer at SCE, told reporters in a conference call.

    The problems center on four steam generators that were installed at San Onofre during a $670 million overhaul in 2009 and 2010. Tests found some tubes were so badly corroded that they could fail and possibly release radiation, a stunning finding inside the nearly new equipment.

    The trouble began Jan. 31, when the Unit 3 reactor was shut down as a precaution after a tube break. Traces of radiation escaped at the time, but officials said there was no danger to workers or neighbors. Unit 2 had been taken offline earlier that month for maintenance, but investigators later found unexpected wear on hundreds of tubes inside both units.

    In a March letter, federal regulators outlined a series of benchmarks Edison must reach to restart the plant, including determining the cause of vibration and friction that damaged tubes, and how it would be fixed and then monitored during operation.

    In June, a team of federal investigators announced that a botched computer analysis resulted in design flaws that are largely to blame for unprecedented wear in the tubes.

    Overall, investigators found wear from friction and vibration in 15,000 places, in varying degrees, in 3,401 tubes inside the four generators.

    And in about 280 spots — virtually all in the Unit 3 reactor — more than 50 percent of the tube wall was worn away.

    In Unit 2, investigators found that the wall thickness had been worn away by at least 20 percent in 147 tubes.

    When about a third of the wall thickness wears away, a tube is deemed too risky to keep in service.

    Edison has retired, or plugged, more than 500 tubes in Unit 2 because of damage or as a precaution, a number within the margin to continue operating the plant.

    Dietrich said Unit 2 was susceptible to the same problems that ravaged Unit 3, but engineers believe that the extent of damage was different because of manufacturing and assembly differences that resulted in looser tubes in Unit 3. Running at lower power should correct the trouble, at least in Unit 2, he said.

    The generators, which resemble massive steel fire hydrants, control heat in the reactors and operate something like a car radiator.

    At San Onofre, each one stands 65 feet high, weighs 1.3 million pounds, with 9,727 U-shaped tubes inside, each three-quarters of an inch in diameter.

    Baylor Lariat

    Keep Reading

    Board of Regents approves nearly $1 billion operating budget, new AI-centered master’s degree

    Foster Pavilion to host rising country star Braxton Keith

    Students react to ‘very stressful’ Canvas outage ahead of finals

    Canvas access to be restored, Friday finals moved to online Thursday

    Baylor delays finals as nationwide Canvas outage impedes studying

    Student research findings emphasize importance of deep friendships

    Add A Comment

    Comments are closed.

    Recent Posts
    • Hispanic concert in Foster Pavilion rescheduled due to World Cup Final June 22, 2026
    • Board of Regents approves nearly $1 billion operating budget, new AI-centered master’s degree May 21, 2026
    About

    The award-winning student newspaper of Baylor University since 1900.

    Articles, photos, and other works by staff of The Baylor Lariat are Copyright © Baylor® University. All rights reserved.

    Subscribe to the Morning Buzz

    Get the latest Lariat News by just Clicking Subscribe!

    Follow the Live Coverage
    Tweets by @bulariat

    Facebook X (Twitter) Instagram YouTube LinkedIn
    • Featured
    • News
    • Sports
    • Opinion
    • Arts and Life
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.