Most of the green fences and construction barriers along Bagby and Third Street will remain up for the rest of this semester and through the summer until East Village, Baylor’s newest residential community, is finished.
Trending
- SLIDESHOW: Baylor vs. Louisiana Tech
- Bennett’s 4 touchdowns push Baylor past Louisiana Tech 36-19
- Baylor’s defense slowed down in win over LA Tech
- Last-second equalizer forces No. 12 Baylor soccer into draw with No. 9 West Virginia
- Old Dominion brings bright lights, classic country to Foster Pavilion
- No. 18 Baylor volleyball surges past UTEP behind 3rd set rally
- Review: Lizzy McAlpine explores connection with ‘Angel’
- Lariat TV News: September 18th, 2026

