The project will replace the university’s heating and cooling steam-reliant system, set in 1962, with a more efficient hot-water system. Anchored by a new central utility plant, it will reach around six miles of underground piping and restructure a part of Baylor many students are familiar with.
Browsing: Baylor Energy Complex
Lot 42, the parking lot located on the east side of the Sid Richardson Building, will be closed starting Saturday because of construction. The lot is scheduled to re-open Aug. 13.
Two boilers on campus providing heat and hot water to the buildings stopped working at around 8:30 p.m. Wednesday.
Unexpectedly during conversations, rumors surface. Whispers of a secret series of underground tunnels that connect every building on campus penetrate the air. Some people insist they exist, while others place the tunnels in the same category as Santa Claus.
Noisy neighbors, blaring televisions and the roommate’s barking dog are enough to make the ideal study environment hard to come by.
